1.0 Purpose 
 
 The purpose of this procedure is to describe all stages of manufacturing, packaging, labeling,
 testing and holding of Liquids, Lotions, Creams, and Serums to ensure the identity, purity,
 
 strength and composition of each product. 
 
 2.0 Scope 
 
 This procedure applies to all liquid form finished products manufactured at Ion Labs, Inc.
 
 3.0 Responsibility 
 
 3.1 It is the responsibility of all departments — Production, R&D, QA, QCS, QCL,
 
 Purchasing, Shipping, and Receiving to strictly follow this procedure.
 
 4.0 Definitions 
 
 4.1 Identity — A specific unique characteristic of a product; a positive match (complies)
 between an established/standardized characteristic and a finished product attribute
 
 4.2 Purity —Absence of impurities 
 
 4.3. Strength — Concentration of listed component 
 
 4.4 Composition — Appropriate list of ingredients and components in finished product
 
 4.5 Quality — Means that the finished product consistently meets the established
 specifications for identity, purity, strength and composition, and has been
 manufactured, packaged, labeled, tested, and held under conditions to prevent
 
 adulteration 
 
 4.6 QC- Quality Control 
 
 4.7 LC — Label Control 
 
 4.8 R&D -— Research and Development 
 
 
 

[SOP 

 Standard Operating Procedure SOP No | Rev Page 
 Ensuring the Identity, Purity, Strength and A-l19 | 3 2 of 10 
 Composition of Liquid Form Finished Products 
 
 4.9 PO — Purchase Order 
 
 4.10 CoA — Certificate of Analysis 
 
 4.11 RMP — Raw Material Profile 
 
 4.12 RMID — A unique identifying number assigned to each raw material 
 
 4.13 R# — A unique identifying number assigned to individual batches of raw materials upon
 receipt 
 
 4.14 RMSTT — Raw Material Specification and Test Ticket; A document that lists test
 methods, specifications, results and information for each unique raw material
 
 4.15 MBR — Master Batch Record; a compilation of documents and forms that identifies
 all of the pertinent instructions, processes, and specifications necessary to
 manufacture a product 
 
 4.16 BPR — Batch Production Record; an accurate reproduction of the MBR issued to
 production 
 
 4.17 Product Profile — Establishes a products components, in-process, finished product
 specifications, and stability which ensure the identity, purity, strength, and
 composition of the product 
 
 4.18 FPTT — Finished Product Test Ticket; an internal CoA 
 
 4.19 CCP — Critical Control Point; a point during production of a product at which
 controls are applied and adherence to specification is determined prior to proceeding
 
 4.20 IAV — Ingredient Addition Verification and Results Form; Document containing
 specifications associated with label claim support 
 
 4.21 OTC — Over the Counter; medicines sold directly to a consumer without a prescription
 from a healthcare professional. 
 
 5.0 References 
 
 5.1 A-108, SOP, Good Manufacturing Practices and Personal Hygiene 
 
 5.2 B-401, SOP, Liquid Mixing Tank 
 
 5.3 B-604, SOP, LPS Liquid Overflow Filler 
 
 

[SOP 

 Standard Operating Procedure SOP No | Rev Page 
 Ensuring the Identity, Purity, Strength and A-119 3 3 of 10 
 Composition of Liquid Form Finished Products 
 
 5.4 B-904, SOP, Packaging Procedure 
 
 5.5 C-103, SOP, Batch Production Record Review and Release of Finished Product
 
 5.6 C-104, SOP, Master Batch Record and Issuance of Batch Production Record
 
 5.7 C-707, SOP, Critical Control Point Specifications 
 
 5.8 D-702, SOP, Density Determination of Liquids 
 
 5.9 D-105, SOP, Out of Specification/Out of Trend Investigation 
 
 5.10 D-403, SOP, Calculations for Ingredient Addition Verification for Finished Products
 
 5.11 D-901, SOP, Raw Material Life Cycle 
 
 5.12 D-902, SOP, Establishment of Specifications 
 
 5.13 E-204, SOP, Receiving Process for Raw Materials 
 
 5.14 E-601, SOP, Vendor Qualification 
 
 5.15 E-702, SOP, Finished Product Sampling Procedure 
 
 5.16 E-703, SOP, Raw Material Sampling 
 
 5.17 E-704, SOP, AQL Statistical Sampling Plan 
 
 5.18 E-802, SOP, Quarantine of Materials 
 
 5.19 21 CFR Part 111 
 
 5.20 21 CFR Part 211 
 
 5.21 21 CFR Part 700 
 
 6.0 Procedure 
 
 6.1 Purchasing of Raw Materials 
 
 6.1.1 All raw materials used in the manufacturing of Liquids/Lotions/Creams must be
 
 purchased from qualified suppliers, approved by Ion Labs and must be listed on
 the Approved Vendors List as per SOP E-601 Vendor Qualification.
 
 6.2 Receiving, Inspection, Sampling, testing and release of Raw Materials
 
 

[SOP 

 Standard Operating Procedure SOP No | Rev Page 
 Ensuring the Identity, Purity, Strength and A-119 3 4 of 10 
 Composition of Liquid Form Finished Products 
 
 6.2.1 Receiving of Raw Materials 
 
 6.2.1.1 Purchasing will make available in Batchmaster approved POs to
 warehouse personnel. 
 
 6.2.1.2 | The warehouse associate compares incoming materials to the
 packing list and Batchmaster item description. The warehouse will
 
 quarantine material that does not match the PO for quality, grade or
 vendor. Quality will be notified of the discrepancy and determine the
 suitability of the material. 
 
 6.2.1.3 | Warehouse associate assigns a sequential number in the format of
 R00001 to each incoming raw material, creates a label containing the
 
 RMID, raw material name, R number, vendor name, and vendor lot
 number for the raw material container, and applies to each bulk
 container of raw material (refer to SOP D-901 Raw Material Life
 Cycle, SOP E-204 Receiving Process of Raw Materials, and SOP E-
 802 Quarantine of Materials). 
 
 6.2.2 Inspection and Sampling of Raw Materials 
 
 6.2.2.1 QC samples raw materials according to SOP E-703 Sampling of Raw
 Materials and E-704 AQL Statistical Sampling Plan. 
 
 6.2.2.2 The samples will be delivered to the lab for analysis along and
 logged into the QC laboratory sample log book (Refer to SOP E-703
 
 Sampling of Raw Materials.) 
 
 6.2.3 Testing and Release of Raw Materials 
 
 6.2.3.1 QC Lab completes the testing of raw materials as outlined in the
 RMP based on the CoA Challenge Status, and documents the results
 on the RMTS (Refer to SOP D-901 Raw Material Life Cycle).
 
 Note: Data generated for the first component of a partial
 
 shipment can be used for the second component release in
 instances when partial shipments are received, each with
 the same manufacturer lot # and separate R#s are
 generated. A separate RMTS will be generated for the
 second component of the partial shipment for tracking
 
 purposes. 
 
 

[SOP 

 Standard Operating Procedure SOP No | Rev Page 
 Ensuring the Identity, Purity, Strength and A-119 3 5 of 10 
 Composition of Liquid Form Finished Products 
 
 6.2.3.1.1 Raw materials that meet the release specification listed in
 
 the RMP can be processed for release. QC lab updates the
 raw material status in Batchmaster to “Released”. (Refer
 to SOP D-901 Raw Material Life Cycle and SOP E-802
 Quarantine of Materials/ Products). 
 
 Note: All approved RMs that are used in Ion Labs
 products are subject to CofA challenges as defined
 in SOP D-901 Raw Material Life Cycle and must
 pass verification testing if the RMs are to be used
 in Ion products. All raw materials require three
 
 CofA challenges before reduced testing can be
 implemented. 
 
 6.2.3.1.2 For raw materials that do not meet the release
 specifications listed in the RMP, the QC lab will update
 the raw material status in Batchmaster to “Hold” until a
 
 final disposition has been made by Quality Management
 (Refer to SOP D-105 Out of Specification/Out of Trend
 Investigation and SOP E-802 Quarantine of 
 Materials/Products). 
 
 6.3 Production and Process Control System 
 
 6.3.1 Master Batch Record and Issuance of Batch Production Record 
 
 6.3.1.1 R&D creates Product Profile, prepares the Master Formula,
 Weighing and Blending Instructions, and Supplement Facts Sheet for
 each unique Formula to ensure uniformity in the finished batch (refer
 to SOP C-603 New Product Realization Process). 
 
 6.3.1.2 The BPR issued to production, accurately follow the appropriate
 
 MBR and all steps in the manufacturing of the batch (Refer to SOP
 C-104 Master Batch Record and Issuance of Batch Production
 Record). 
 
 6.3.2 Manufacturing Operations 
 
 Note: All manufacturing operation must be conducted under conditions and
 controls that protect against the potential for growth of
 
 microorganisms and the potential for contamination. 
 
 

[SOP 

 Standard Operating Procedure SOP No | Rev Page 
 Ensuring the Identity, Purity, Strength and A-119 3 6 of 10 
 Composition of Liquid Form Finished Products 
 
 Only plastic pallets are permitted inside manufacturing areas where
 
 raw materials and product are exposed. Wooden pallets are only
 allowed in packaging rooms when preparing shipping boxes.
 Wooden pallets are only allowed in the warehouse, hallways and
 areas where material and product are not exposed. All wooden
 
 pallets must be heat-treated and marked “HT”. 
 
 The personnel must be garbed appropriately with frocks and/or
 disposable lab coats, shoe covers and/or dedicated shoes as
 applicable, hair nets, beard covers, safety glasses and gloves (refer to
 SOP A-108 Good Manufacturing Practices and Personal Hygiene).
 
 Identify all processing lines and major equipment used during
 
 manufacturing to indicate their contents, including the name of the
 lotion/cream/serum and the specific batch number. 
 
 Each stage of the manufacturing process should be approved or
 rejected by QC personnel. 
 
 6.3.2.1 Weighing and Blending Process (Refer to SOP B-901 Weighing and
 Blending Procedure). 
 
 6.3.2.1.1 A QC inspection of the room, equipment, balances, and
 utensil cleanliness must take place prior to any weighing
 and blending. The inspection must be documented on the
 
 BPR. 
 
 6.3.2.1.2 Before weighing a raw material, the following must be
 verified by the operator and QC inspector and the
 verification recorded in the BPR: 
 
 e Check the RMID against the BPR. 
 
 e Check the description of the material against the BPR.
 
 e Ensure the material has been released by QC.
 
 e Check the expiration date of the material. 
 
 6.3.2.1.3 During the weighing, the following steps should be
 observed: 
 
 

[SOP 

 Standard Operating Procedure SOP No | Rev Page 
 Ensuring the Identity, Purity, Strength and A-l19 | 3 7 of 10 
 Composition of Liquid Form Finished Products 
 
 Tare the scale to read zero between each weighing
 step. 
 
 The R # of each raw material must be documented in
 the BPR. 
 
 Each step of the weighing process should be checked
 
 by a second production person and/or QC inspector as
 per BPR. 
 
 6.3.2.1.4 During the blending, the following steps should be
 observed: 
 
 Place the weighed raw materials into the mixing tank,
 
 following the instructions on the BPR. 
 
 Each step of the blending process must be checked by
 a second production person and/or QC as per BPR.
 
 After the blending process QC inspector performs
 
 CCP 6 Liquid/Lotion/Cream Tank Sampling. QC Lab
 will perform CCP 6 testing and QC will provide
 startup approval based on lab results before blended
 lotions, creams, or serums can be transferred to the
 filling department. (Refer to SOP C-707 Critical
 
 Control Point Specifications). 
 
 If the blend is approved, QC will release the blend for
 the next manufacturing stage. 
 
 If the blend is not approved, Quality and R&D will be
 
 notified of the failure. 
 
 6.3.2.2 Packaging Process (Refer to SOP B-904 Packaging Procedure)
 
 6.3.2.2.1 Prior to the beginning of the packaging process, the
 container(s) containing the lotions, creams, or serums and
 all packaging components must be inspected by QC
 personnel for the correct product, batch number, and
 
 packaging. They should be released and approved by QC
 personnel. This has to be documented in the BPR.
 
 

[SOP 

 Standard Operating Procedure SOP No | Rev Page 
 Ensuring the Identity, Purity, Strength and A-119 3 8 of 10 
 Composition of Liquid Form Finished Products 
 
 6.3.2.2.2 A QC inspection of the packaging area, equipment,
 utensil and scale(s) must take place prior to the beginning
 of packaging process. The inspection must be 
 documented on the BPR. 
 
 O.552.2.5 The packaging procedure stated in the BPR must be
 
 strictly followed. 
 
 6.3.2.2.4 Packaging operator performs four bottle checks at the
 beginning and every 30 minutes until the end of the
 packaging process for product quality. 
 
 6.3.2.2.5 QC performs four bottle checks at the beginning and
 
 every one hour until the end of the packaging process for
 product quality. Interval based inspections can be
 adjusted as needed based on risk (refer to SOP B-905
 Quality Control Inspection Process). 
 
 e Verify the fill weight and ensure that the product is
 
 free from foreign material and consistent in color
 
 e CCP-7 Liquid/Lotion/Cream Weight Verification
 
 6.3.2.2.6 The labels must be issued by Label Control and must be
 the correct labels for the job. The product label used must
 be affixed on the appropriate space(s) in the BPR before
 
 the beginning of the labeling process and signed by QC
 personnel. 
 
 6.3.2.2.7 The labeling instructions stated in the BPR must be
 strictly followed. 
 
 6.3.2.2.8 Packaging operator performs four bottle checks at the
 
 beginning and every 30 minutes and at the end of the
 labeling process for product quality. 
 
 63.229 A QC Inspector performs four bottle checks at the
 beginning and every hour until the end of the labelling
 process to ensure product quality. Intervals can be
 adjusted as needed based on risk (refer to SOP B-905
 
 Quality Control Inspection Process) 
 
 

[SOP 

 Standard Operating Procedure SOP No | Rev Page 
 Ensuring the Identity, Purity, Strength and A-119 3 9 of 10 
 Composition of Liquid Form Finished Products 
 
 6.3.2.2.10 At the completion of packaging, QC inspector should
 
 submit to QC Lab reserve samples and stability samples
 (if required). (Refer to SOP E-702 Finished Product
 Sampling Procedure). 
 
 6:3.2.2:11 The pallet(s) with packaged product/bulk should be
 
 properly identified with product name, customer name,
 batch number, pallet(s) number and quantity. QC will
 place a "Hold-Pending Release" tag on each pallet and
 product should be moved to designated area holding for
 QC test results and release by QC department (Refer to
 
 SOP E-802 Quarantine of Materials/ Products). 
 
 Note: All components and lotions/creams/serums should
 be held under appropriate conditions of 
 temperature, humidity, and light so that the
 identity, purity, strength, and composition of the
 
 components and lotions/creams/serums are not
 affected. 
 
 6.3.2.3 Finished Product Testing and Release 
 
 6.3.2.3.1 QC inspector takes the test samples/micro samples to the
 laboratory for analysis and logs them in the QC
 
 laboratory sample log book. 
 
 iiee BP QC Lab is responsible for testing all finished products in
 accordance with SOP D-902_ Establishment of 
 Specifications. 
 
 6.3.2.3.3 QC Lab performs the specified testing in accordance with
 
 applicable laboratory method standard operating
 procedures and documents in a laboratory notebook or on
 the appropriate forms (Refer to section D SOPs 
 Laboratory Operations and Specifications). 
 
 6.3.2.3.4 At the completion of testing, QC Lab enters the results of
 the testing on the Method Specific Test Tickets and
 
 Finished Product Test Ticket — Internal CofA. 
 
 

[SOP 

 Standard Operating Procedure SOP No | Rev Page 
 A-119 10 of 16 
 Ensuring the Identity, Purity, Strength and 
 Composition of Liquid Form Finished Products 
 6.3.2.3.5 Any finished product testing failures [ie. Out of
 
 Specification (OOS) results] are investigated per D-105
 Out of Specification/Out of Trend Investigation.
 
 6.3.2.3.6 QC supervisor/designee will review the entire BPR to
 ensure that it is complete, all required information is
 
 entered or attached, and all the signatures/ dates are in
 place and will make a final disposition (Refer to SOP C-
 103 Batch Production Record Review and Release of
 Finished Product). 
 
 e If the product is released, Quality Systems will
 
 notify applicable departments and a warehouse
 associate will remove the "Hold- Pending Release"
 tag. 
 
 e If the product is rejected, QC should change the
 
 “Hold- Pending Release” tag to a “QC Hold” tag ona
 pallet and move the pallet to the designated area until
 further investigation is performed and finalized.
 
 7.0 Revision History 

| Rev | Date | Description of Changes | CCR # | By |
|-----|----------|------------------------|-------|----|
| 0 | 11/10/16 | New | 16-0607 | L. Titolo |

 12/07/16 Cfohramn gaed atitle. aAligned s pnroatoicaolc tnoe rde falte c7t pLraobcess.s for all li,q uid l-I1T> ae
 
 Updated outdated definitions and references, update procedure 
 2 05/01/20 to include the use of Batchmaster, edit language for clarity, CC-20-0318 S. Sassman
 edit to be consistent with current practices. 
 3 08/04/21 Removed reference to FPSS added reference to FPTT. CC-21-0306 C. Mitchell