1.0 Purpose 
 
 The purpose of this procedure is to define the process of setup, operation, and cleaning for the
 
 inline rotary chuck capper. 
 
 2.0 Scope 
 
 This procedure applies to the inline rotary chuck cappers in operation at Jon Nutritional Labs.
 
 3.0 Responsibility 
 
 3.1 It is the responsibility of Production (Packaging) personnel to follow this procedure.
 
 3.2 It is the responsibility of Production Management to implement this procedure and to
 ensure that the procedure is being followed. 
 
 3.3 It is the responsibility of Production Management and/or Maintenance & Engineering to
 
 keep this procedure aligned with current practices. 
 
 4.0 Definitions 
 
 N/A 
 
 5.0 References 
 
 5.1 B-111, SOP, Cleaning of Manufacturing/Production Areas and Equipment
 
 5.2 B-105, SOP, Preparation of Cleaning and Sanitizing Chemicals for Production
 
 6.0 Procedure 
 
 6.1 Setup 
 
 6.1.1 Ensure that the machine is clean and cleared of all previously used materials.
 
 6.1.2 Install the Cap Disc Starwheel. 
 
 
 

[SOP 

 Standard Operating Procedure SOPNo | Rev 
 B-618 0 Page 2 of 4 
 Inline Rotary Chuck Capper 
 
 G:1:3 Install the Cap Disc Guide and connect any/all air lines to their intended
 connection(s) at the Air Panel. 
 
 6.1.4 Install the infeed and outfeed segments of the Capper Backguide.
 
 6.1.5 Install the Backguide Belt and connect the Backguide air line to its intended
 
 connection on the machine. 
 
 6.1.6 Install both segments of the Capper Starwheel. 
 
 6:li7 Install all six of the Capping Chucks. 
 
 6.1.8 Install the Centerguide. 
 
 6.1.9 Install both segments of the Discharge Starwheel. 
 
 6.1.10 Install both segments of the Feedscrew Backguide. 
 
 6.1.11 Install both segments of the Infeed Starwheel. 
 
 6.1.12 Install the Feedscrew. 
 
 6.1.13 Install the Front and Rear Discharge Conveyor Guides. 
 
 6.1.14 Install the Infeed Guide. 
 
 6.1.15 Attach the Lower Cap Chute to the Upper Cap Chute. 
 
 6.1.15.1 DO NOT attach the bottom end of the lower cap chute to the cap disc
 
 guide until the capper turret height adjustment is made. Doing so at this
 
 point WILL CAUSE DAMAGE to the machine. 
 
 6.1.16 Fill hopper with caps. 
 
 OZ Startup 
 
 6.2.1 Power on the capper but do not start it. 
 
6.2.2 Ensure that any/all air lines are connected to their intended connections on the

 machine. 
 6.2.3 Power on the cap elevator. 
 
 6.2.4 Switch the capper into Setup Mode. 
 
 
 

[SOP 

 Standard Operating Procedure SOPNo | Rev 
 B-618 0 Page 3 of 4 
 Inline Rotary Chuck Capper 
 
 6.2.5 Select the correct recipe from the “Products” screen. 
 
 6.2.6 Make sure that the lower cap chute is detached from the cap disc plate.
 
 6.2.7 Adjust the capper turret height to the recipe setpoint height.
 
 6.2.8 Connect the lower cap chute to the cap disc plate. 
 
 6.3 Operation 
 
 6.3.1 Switch the capper to Run Mode. 
 
 6.3.2 Start the capper. 
 
 6.3.3 Keep hopper full of caps at all times. 
 
 6.3.4 Monitor bottles coming into the capper and confirm they are not under or over-
 
 filled, are properly oriented, undamaged, etc. 
 
 6.3.5 Monitor the capper as bottles are processed, making sure they are being capped
 correctly, properly guided through the machine, and appropriately rejected.
 
 6.3.6 Monitor bottles coming out of the capper, making sure there are no uncapped
 
 bottles and that they are properly oriented on the conveyor. 
 
 6.3.7 Report any machine wear or damage to immediate Supervisor and/or
 
 Maintenance personnel. 
 
 6.4 Cleaning & Disassembly 
 
 6.4.1 Prepare cleaning agents as outlined in SOP B-105 Preparation of Cleaning and
 Sanitizing Chemicals for Production. 
 
 6.4.2 Follow SOP B-111 Cleaning of Manufacturing/Production Areas and Equipment
 
 to ensure proper cleaning and sanitization are performed for this type of
 equipment and that these activities are properly documented. 
 
 6.4.3 The following disassembly steps are required prior to cleaning:
 6.4.3.1 Clear any outstanding alarms. 
 
 6.4.3.2 Disconnect the Lower Cap Chute from the Cap Disc Guide.
 
 
 

[SOP 

 Standard Operating Procedure SOP No Rev 
 B-618 Page 4 of 4 
 Inline Rotary Chuck Capper 
 6.4.3.3 Raise the Capper Turret to maximum height. 
 
 6.4.3.4 Remove the Infeed Guide. 
 
 6.4.3.5 Remove the Feedscrew Backguide. 
 
 6.4.3.6 Remove the Feedscrew. 
 
 6.4.3.7. Remove the Infeed Starwheel. 
 
 6.4.3.8 Remove the Front and Rear Discharge Conveyor Guides. 
 
 6.4.3.9 Remove the Discharge Starwheel. 
 
 6.4.3.10 Disconnect the Backguide air line and remove the Backguide Belt.
 
 6.4.3.11 Remove both segments of the Capper Backguide. 
 
 6.4.3.12 Remove both segments of the Capper Starwheel. 
 
 6.4.3.13 Remove all six of the Capping Chucks. 
 
 6.4.3.14 Remove both segments of the Centerguide. 
 
 6.4.3.15 Disconnect air lines from the Air Panel and remove the Cap Disc Guide.
 
 6.4.3.16 Remove the Cap Disc Starwheel. 
 
 6.4.4 Inspect the equipment to ensure that there is no remaining product prior to
 
 reassembly. 
 
 7.0 Revision History 

| Rev | Date | Description of Changes | CCR # | By |
|-----|----------|------------------------|-------|----|
| 0 | 09/14/23 | New procedure. N/A A. Gatev | - | - |