B-906

Gummy Manufacturing Process

Section B — Manufacturing Revision 1 11 pages

Original Document

Scanned document (image-only PDF)

Extracted Text

Searchable text extracted from PDF

1.0 Purpose 
 
 This procedure describes the standard operation of gummy manufacturing (named chewable
 
 gels per the Unites States Pharamacopeia). 
 
 2.0 Scope 
 
 This procedure applies to all GMP batches manufactured on Gummy Machine 1 (GM-1) at Ion
 Labs Inc. 
 
 3.0 Responsibility 
 
 3.1 It is the responsibility of Production (Gummy) personnel to strictly follow this procedure.
 
 3.2 It is the responsibility of the QC Inspectors to follow the quality steps outlined in this
 
 procedure. 
 
 3.3. It is the responsibility of the Department Manager/Supervisor to implement this
 
 procedure and to ensure that the procedure is being followed. The Department
 
 Manager/Supervisor is also responsible for maintaining this procedure and ensuring that
 it is kept up to date with 
 
 3.4 It is the responsibility of Operations to maintain the sanitation of the equipment in
 accordance with this procedure. 
 
 4.0 Definitions 
 
 4.1 BPR — Batch Production Record 
 
 4.2 CCP — Critical Control Point 
 
 
 

[SOP 

 Standard Operating Procedure SOP No | Rev = 
 Gummy Manufacturing Process B-906 1 age 2 of 11 
 
 4.3, QC - Quality Control 
 
 4.4 GMP - Good Manufacturing Practices 
 
 4.5. GM-1—- Gummy Machine 1 
 
 4.6 Batter —-Gummy base containing pectin, sugar, syrup, buffer and water. The dry premix
 
 of these ingredients (minus syrup and water) may also be referred to as batter.
 
 4.7. CMS — Cooking and Mixing System 
 
 4.7.1 CM-PLC — Cooking and Mixing Control Panel 
 
 4.7.2 Kettle 1 — Hemispheric kettle closest to control panel 
 
 4.7.3 Kettle 2 — Hemispheric kettle furthest from control panel 
 
 4.7.4 Open Switch — Switches that control the stoppers on the Kettles, i.e. Open 1 and
 
 Open 2 for Kettles 1 and 2 respectively. 
 
 4.7.5 Tank 3 — Cylindrical tank furthest from control panel which contains no heating
 
 element 
 
 4.7.6 Tank 4 — Cylindrical tank closest to control panel which contains heating
 
 elements 
 
 4.7.7 Pump 1 — Transfer pump from Kettle 1 and 2 to Tank 3 
 
 4.7.8 Pump 2 — Transfer pump from Tank 3 to Tank 4 
 
 4.7.9 Pump 3 — Transfer pump from Tank 4 to the gummy hopper 
 
 4.7.10 Water Pump — Circulates water in the heated jackets of kettle 4 and piping.
 
 4.7.11 Hot 1 — On/Off switch for heating elements for Kettle 1 
 
 4.7.12 Hot 2 — On/Off switch for heating elements for Kettle 2 
 
 4.7.13 Hot 3 — On/Off switch for heating elements in Tank 4 
 
 

[SOP 

 Standard Operating Procedure SOP No | Rev 
 Gummy Manufacturing Process B-906 1 Page 3 of 11 
 
 4.8 GDL — Gummy Depositing Line 
 
 4.8.1 DL-PLC — Depositing Line Control Panel 
 
 4.8.2 Clean Pan — Stainless steel pan used to purge the depositors so that waste does
 not purge onto molds. 
 
 4.9 Tumbler — Cylindrical machine for tumble coating the gummies 
 
 4.10 Drying Trays — Ventilated trays for drying gummies 
 
 4.11 Dry Room — Temperature and humidity controlled room for curing the gummies to a set
 water content 
 
 4.12 Simple Green — Cleaning solution used by Ion Labs 
 
 4.13 PPE — Personal Protective Equipment 
 
 4.14 AQL — Acceptable quality level; a statistical measurement of the maximum acceptable
 number of defective goods in a particular sample size 
 
 5.0 References 
 
 5.1 A-108, SOP, Good Manufacturing Practices and Personal Hygiene 
 
 5.2 D-794, SOP, Use and Calibration of an Analog Brix Meter 
 
 5.3 B-111, SOP, Cleaning of Manufacturing/Production Areas and Equipment
 
 5.4 E-803, SOP, Inspection of Palletized In-Process and Finished Product
 
 5.5 C-104-F31, Form, Gummy Coating Record 
 
 5.6 C-104-F32, Form, Gummy Record 
 
 5.7 C-707-F12, Form, CCP 9 —- Gummy Blend Brix Record 
 
 5.8 C-707-F 13, Form, CCP 10 — Deposition Checks 
 
 

[SOP 

 Standard Operating Procedure SOP No Rev 
 Gummy Manufacturing Process B-906 Page 4 of 11 
 
 5.9 C-707-F14, Form, CCP 11 — Pre-Curing 
 
 5.10 C-707-F15, Form, CCP 12 — Post-Curing 
 
 5.11 B-111-F5, Form, Area Group 4 Cleaning Form 
 
 6.0 Procedure 
 
 6.1 All Personnel must follow GMP as per SOP A-108 Good Manufacturing Practices and
 Personal Hygiene. 
 
 6.2 All Personnel must wear appropriate PPE. The jackets on the equipment are hot and may
 
 cause serious burns if touched. The equipment involves fluids under pleasure and as such
 there is always an inherent risk of these fluids spraying into the room. Some fluids contain
 
 concentrated weak acids, which are eye irritants. Protective eyewear is necessary when
 working near the equipment, and heat gloves are recommended when working with the
 
 hot kettles and piping. 
 
 6.3. Preparing the batch 
 
 6.3.1 Verify the gummy room has the correct product name and batch number that
 
 matches with the BPR. 
 
 6.3.2 Ensure that a major cleaning has been performed on the room according to
 
 procedures detailed in section 6.8. 
 
 6.3.3 Ensure that the drying room is clean and set to the temperature and relative
 
 humidity specified in the BPR. 
 
 6.3.4 Set up the gummy depositing room for ventilation and dehumidification.
 
 6.3.5 Ensure that all scales are properly calibrated and log books are filled out. If any
 scale is past due for calibration, decommission and inform QC and Analytical
 
 Development. 
 
 

[SOP 

 Standard Operating Procedure SOP No | Rev 
 Gummy Manufacturing Process B-906 1 Page 5 of 11 
 
 6.3.6 Calibrate the refractometer according to SOP D-794 Use and Calibration of an
 
 Analog Brix Meter. 
 
 6.3.7 Ensure the air-line is connected to the GDL and air is flowing.
 
 6.3.8 Adjust oil sprayers. 
 
 6.3.8.1 Using the DL-PLC, turn on the mold drive and oil sprayers.
 
 6.3.8.2 Manually adjust the spray using the individual valves on each sprayer to
 
 evenly coat the molds. 
 
 Note: Using a clean piece of cardboard allows you to more easily see the
 
 quantity of oil coming from each sprayer and adjust accordingly.
 
 6.3.9 QC Inspectors must inspect GM-1 and all components. Upon satisfactory cleaning
 
 inspection the room and equipment cleaning logs must be signed indicating the
 
 room was clean prior to commencing manufacturing. The QC inspector will
 inspect the following areas to make sure they are visually clean:
 
 6.3.9.1 The molds of the machine 
 
 6.3.9.2 The blue product belt 
 
 6.3.9.3 The blue product belt tray (located in-between the belt)
 
 6.3.9.4 The 2 bristle spinners on the underside of the machine
 
 6.3.9.5 Inside kettle 1, 2 and Tank 3 and 4 
 
 6.3.9.6 Inside the depositor hopper 
 
 6.3.10 Production must bring all components of the total batch into GM-1 and check all
 materials needed for the batch are present and correct. 
 
 6.3.11 QC Inspectors must verify all materials are present and correct.
 
 6.3.12 Once materials are verified, utilize the BPR to begin weigh-out.
 
 

[SOP 

 Standard Operating Procedure SOP No | Rev 
 Gummy Manufacturing Process B-906 1 Page 6 of 11 
 
 63,1251 This manufacturing process is semi-continuous. The total batch weights
 will be broken down into sub-blends of up to 150 kg each. This batch
 
 break-down is detailed in the manufacturing weigh & mix instructions.
 A standard weigh sheet will be used to document total batch usages.
 
 63.122 Purified water is to be taken fresh daily from Ion Labs purified water
 
 system. Purified water taps are available in the liquids manufacturing
 suites L-1 through L-5. Follow standard procedures for obtaining
 
 purified water, i.e. flush the tap for a specified amount of time before
 filling the transfer container. Only use clean containers/vessels to
 
 transfer water. Do not hold water for longer than is necessary to process
 the batch and all water is to be used same day. 
 
 6.3.12.3 It is recommended to heat a large quantity of purified water at the start
 
 of the batch and store it in a clean insulated container for later use.
 
 6.3.13 Consult CCP-10 of the batch record for the desired flow rates of the acid and
 
 flavors. Calibrate the flow rates according to the instructions on form C-707-F13
 CCP 10 — Deposition Checks. 
 
 6.4 Blending 
 
 6.4.1 Heat the necessary quantity of water to ~95 °C using one of the kettles, then
 
 transfer into an insulated container for later use. 
 
 6.4.2 Turn on the Water Pump and Hot 3 (set to 78 °C) to begin warming the jackets
 
 on Tank 4 and the transfer lines. 
 
 6.4.3 Prepare premixes as described in the BPR. 
 
 6.4.4 Prepare batter as described in BPR (Time to reach Brix will be ~1-2 hrs).
 
 6.4.5 Transfer batter to tank 3 and add in actives as described in BPR.
 
 6.4.6 Transfer batter to tank 4 as described in BPR. 
 
 

[SOP 

 Standard Operating Procedure SOP No | Rev 
 Gummy Manufacturing Process B-906 1 Page 7 of 11 
 
 6.5 Depositing 
 
 6.5.1 Turn on heating elements for depositor. 
 
 6.5.2 Place the clean pan under depositors. 
 
 6.5.3 Open the appropriate manual vales to allow flow from Tank 4 to waste.
 
 6.5.4 Adjust flow rates for the aqueous acid and flavor as instructed on form C-707-
 F13 CCP 10 — Deposition Checks. Record parameters used in the BPR.
 
 6.5.5 Using the DL-PLC, adjust the flow rate for the gummy solution (Pump 3) as
 instructed on form C-707-F13 CCP 10 — Deposition Checks. Record parameters
 
 used in the BPR. 
 
 6.5.6 Turn on CFA mixer 1 using the DL-PLC. 
 
 6.5.7 Before flowing to hopper, it is necessary to do a “set check”.
 
 6.5.7.1 With the valve still set to waste, turn on all flows (acid, flavor, and
 gummy solution) and collect the gummy solution in a clean bucket.
 
 Note: Gummy solution collected in this bucket may be added back to Tank 4
 to decrease waste. 
 
 6.5.7.2 Periodically sample the gummy mixture directly from the output and
 observe how it sets. 
 
 6.5.7.3 When the solution appears to be gelling, take a small sample a fill,
 
 several pre-oiled molds. 
 
 6.5.7.4 Place the mold in the cooling tunnel and wait at least 3 minutes.
 
 6.5.7.5 Remove the mold and eject the gummy. If properties are acceptable then
 
 you may begin pumping to the hopper. 
 
 6.5.8 With all flows turned on, switch the manual valve from waste to hopper.
 
 

[SOP 

 Standard Operating Procedure SOP No | Rey 
 Gummy Manufacturing Process B-906 1 Page 8 of 11 
 
 6.5.9 Collect enough molten gummy in the hopper to cover the depositors, then proceed
 
 to the next step. 
 
 6.5.10 Using DL-PLC, briefly run the depositing pistols in “clean” mode to ensure all
 depositing heads are working and any water in the line is purged into the clean
 
 pan. Once verified, turn off depositing and remove the clean pan.
 
 6.5.11 Gummy Weight Check 
 
 6.5.11.1 When the hopper reaches 3/4" full, use the GDL-PLC to engage the
 mold drive, mold jump, and depositors to begin depositing gummies into
 
 molds. 
 
 6.9.11.2 Allow at least 6 depositing strokes and observe consistency in gummies
 before stopping depositing and turning off all flows to not overfill the
 
 hopper. Allow the filled molds to enter the cooling tunnel and then
 disengage the mold drive. 
 
 6.5.11.3 Perform weight checks on the gummies as instructed on form C-707-
 F13 CCP 10 — Deposition Checks. Record information in the BPR. If
 
 necessary, adjust the depositing length of the pistons. This can either be
 
 done manually on individual depositors by turning them with a wrench,
 or uniformly using the GDL-PLC. If adjustments were made go back to
 
 step 6.5.11.2. Ifnot proceed to the next step. 
 
 6.5.12 Turn on all flows, engage the mold drive and lift, turn on the conveyor belt and
 
 brushes using the GDL-PLC and begin depositing. 
 
 6.5.13 Begin collecting gummies on drying trays. They must be single layer and gummy
 
 to gummy contact should be limited. Trays can be stacked on top of each other on
 
 carts. 
 
 6.5.14 Notify QC that they must start collection and documentation of the batch.
 
 

[SOP 

 Standard Operating Procedure SOP No | Rev oe 
 Gummy Manufacturing Process B-906 1 age ? of I] 
 
 6.5.15 QC must perform weight variation of the batch as described on form C-104-F32
 
 Gummy Record. During this time, the operator must also bring a sample of 3
 
 gummies and the print out of C-707-F14 CCP 1] — Pre-Curing from the BPR to
 the QC lab for analysis. 
 
 6.5.16 QC laboratory personnel must perform the required analysis as described on form
 C-707-F14 CCP 11 — Pre-Curing. They must store the recorded data for
 
 production to later retrieve and add back into the BPR. 
 
 6.5.17 Production must perform and record average weight checks every 20 minutes as
 
 described on form C-104-F32 Gummy Record. 
 
 6.6 Coating 
 
 6.6.1 Fill the tumbler with an appropriate amount of coating to start the run.
 
 Note: If using oil and waxed based coating, the coating may be sprayed onto gummy
 trays as they come off the line, as well as sprayed onto gummies while they
 
 tumble. Make at least 4 complete passes with the Spray gun per tray.
 
 6.6.2 Turn the tumbler on and set the direction so that there is no net flow out of the
 
 tumbler. 
 
 6.6.3 Dump the trays of gummies into the tumbler and allow them to coat. The net flow
 
 should be adjusted so that the average gummy spends approximately 5 minutes in
 
 the tumbler. 
 
 6.6.4 Enough Gummies should be added to the coater to maintain a good cascade.
 
 6.6.5 If using oil and wax based coating, keep at least 5 buffing pads inside the coater
 to help buff the wax into the gummies. 
 
 6.6.6 When the gummies have been sufficiently coated, change the direction of the
 tumbler so that it flows onto a separate drying tray. 
 
 

[SOP 

 Standard Operating Procedure SOP No | Rev see 
 Gummy Manufacturing Process B-906 1 age 10 of 11 
 
 6.6.7 Move the drying tray onto the cart and spread the gummies so there are single
 
 layer and gummy to gummy contact is minimized. Repeat section 6.6 until
 
 finished, adding additional coating material as required. 
 
 Note: Gummies should not be doubled or excessively touching each other while drying.
 
 This is crucial for manufacturing non-sticky gummies. 
 
 6.7 Drying 
 
 Note: The Drying Room should be turned on at the start of the run to allow it to equilibrate to
 the temperature and humidity settings. Standard temperature for drying is 40 °C.
 
 6.7.1 Move the carts filled with coated gummies into the drying room and label them
 
 with your initials, product name, batch number, and time / date they were entered
 into the room. 
 
 6.7.2 After approximately 24 hours of drying and approximately every 12 hours
 thereafter, production personnel must bring at least 4 gummies to the QC Lab for
 
 them to perform analysis as instructed on form C-707-F15 CCP 12 — Post-Curing.
 
 6.7.3, QC Laboratory personnel must perform the required analysis as described on form
 
 C707-F15 CCP 12 — Post-Curing. They must store the recorded data for
 production to later retrieve and add back into the BPR. QC Laboratory personnel
 
 must also notify production when specifications are met. 
 
 6.7.4 When the product has reached appropriate dryness specifications, carts are
 weighed on a tared scale to determine batch yield. Notify QC at this stage so they
 
 can perform AQL. 
 
 6.7.5 Label each cart with product name, product number, batch number, weight of
 
 product and date. 
 
 6.7.6 Calculate yields. 
 
 Note: Coating waste is separated from batch waste. Wet sugar from coating is
 considered coating waste. 
 
 

[SOP 

 Standard Operating Procedure SOP No | Rev ea aa 
 Gummy Manufacturing Process B-906 1 age Ilo 
 
 6.8 Cleaning 
 
 6.8.1 Reference SOP B-111 Cleaning of Manufacturing/Production 
 Areas and Equipment 
 for cleaning procedures specific to gummy manufacturing. Document the cleaning
 on form B-111-F5 Area Group 4 Cleaning Form or appropriate Redzone data sheets.
 
 7.0 Revision History 
 
 Revi 
 0 
 s ion 
 08 
 D 
 /0 
 a 
 3 
 t 
 / 
 e 
 2 1 | New procedure, 
 Description of Changes 
 CCR # By 
 \ 05/17/22 f R o e r v m i a s t e t d in A g. Q C L o r a r n e d c t d e r d y i d n o g c r u e m q e u n i t re r m e e f n e t r s e . n c U e p s. dated logo and CC-2 N 2 / - A 0 205 P P . . W W i i l l s s o o n n