1.0 Purpose 
 
 The purpose of this procedure is to define Redzone administration activities.
 
 2.0 Scope 
 
 This procedure applies to administration activities associated with Redzone.
 
 3.0 Responsibility 
 
 3.1 It is the responsibility of all employees provided with permissions to use the RZ Admin
 application to adhere to the requirements of this procedure. 
 
 4.0 Definitions 
 
 4.1 RZ — Redzone; Mark Sutcliffe founded Redzone Production Systems in 2013. The
 
 company website is https://rzsoftware.com/ and provides additional information about
 
 the product. 
 
 4.2 RZ Admin — When written in bold and italic font, this is the Redzone backend
 
 application used to configure the system. 
 
 4.3 Redzone — When written in bold and italic font, this is the Redzone frontend user
 
 application. 
 
 4.4 Backend Application — The backend application provides tools to set user permissions,
 
 define locations to use RZ, define products and associated characteristics, define shifts,
 define data sheets, and define triggers. 
 
 4.5 Frontend Application — The frontend application provides the interface for using the
 RZ Software in the production environment. It is the end user interface.
 
 
 

[SOP 

 Standard Operating Procedure SOP No | Rev bie oes 
 Redzone Administration Activities C-108 0 fee 
 
 4.6 Data sheet — Unless explicitly stated otherwise, a data sheet is an RZ component of the
 RZ Compliance Module that is configured in RZ Admin and used in Redzone to collect
 
 data. 
 
 4.7 Tableau — Tableau is an interactive data visualization software company / tool focused
 
 on business intelligence. The tool is used to query relational databases, online
 
 analytical processing cubes, cloud databases, and spreadsheets to generate graph-type
 data visualizations. 
 
 4.8 SPC — Statistical Process Control; a method of measuring and controlling quality by
 monitoring the manufacturing process. Quality measurements recorded in data sheets
 
 are evaluated against control statistical control rules to identify trends before data is out
 
 of specified limits. 
 
 49 Installation Qualification (IQ) — IQ verifies that equipment or a system is installed
 
 according to the manufacture’s specifications or installation checklist.
 
 4.10 Operational Qualification (OQ) — OQ verifies that equipment or system performance
 
 meets all identified user requirements as defined in a URS document. OQ is performed
 
 after meeting all IQ requirements. 
 
 4.11 Performance Qualification (PQ) — PQ verifies that user requirements as defined in a
 
 URS have been verified similar to OQ. The difference is that PQ evaluates the system
 as a whole while OQ focusses on units individually. 
 
 4.12 Handwritten Signature — Handwritten signature means the scripted name or legal
 mark of an individual handwritten by that individual and executed or adopted with the
 
 present intention to authenticate writing in a permanent form. The act of signing with a
 writing or marking instrument such as a pen or stylus is preserved. The scripted name or
 
 legal mark, while conventionally applied to paper, may also be applied to other devices
 
 that capture the name or mark. 
 
 4.13 Biometrics — Biometrics mean a method of verifying an individual’s identity based on
 
 measurement of the individual’s physical feature(s) or repeatable action(s) where those
 
 
 

[SOP 

 Standard Operating Procedure SOP No | Rev ae 
 Redzone Administration Activities C-108 0 g 
 
 features and/or actions are both unique to that individual and measurable.
 
 4.14 Digital Signature — Digital signature means an electronic signature based upon
 
 cryptographic methods of originator authentication that is computed by using a set of
 rules and a set of parameters such that the identity of the signer and the integrity of the
 
 data can be verified. 
 
 4.15 Electronic Record — Electronic record means any combination of text, graphics, data,
 audio, pictorial, or other information representation in digital form that is created,
 
 modified, maintained, archived, retrieved, or distributed by a computer system.
 
 4.16 Electronic Signature — Electronic signature means a computer data compilation of any
 
 symbol or series of symbols executed, adopted, or authorized by an individual to be the
 
 legally binding equivalent of the individual’s handwritten signature.
 
 4.17 eGMP-— Current Good Manufacturing Practices 
 
 5.0 References 
 
 5.1 C-105, SOP, Protocol and Report Documentation Requirements 
 
 5.2 C-403, SOP, Change Control Procedure 
 
 5.3 C-111, SOP, Redzone General Use 
 
 6.0 Procedure 
 
 6.1 Overview 
 
 6.1.1 Use the backend RZ Admin application to complete development activities
 
 associated with this procedure. Use the Redzone application to complete testing
 activities associated with this procedure. 
 
 
 

[SOP 

 Standard Operating Procedure SOP No | Rev 
 C-108 0 Page 4 of 14 
 Redzone Administration Activities 
 
 6.2 RZ Knowledge Base 
 
 6.2.1 The Knowledge Base available in the Redzone application and the RZ Admin
 
 application both accessed through the “More” tab provides detailed information
 
 about navigating within the application and provides “how to” details to perform
 many of the functions described by this procedure, which is not necessary to
 
 repeat here. Consult the Knowledge Base as needed. 
 
 6.3 Verification of Product Characteristics 
 
 6.3.1 RZ provides the ability to assign product characteristics to products. Product
 characteristics are available to data sheets and provide a mechanism to test data
 
 entered into a data sheet against control and specification limits. Evaluate the
 connection of a data sheet to the proper characteristics during the PQ /
 
 Verification process of the data sheet. Verify that product characteristic values
 
 entered are correct for that product during the review and approval process for
 the applicable product documentation (e.g. product profile, test ticket, etc.).
 
 Include product characteristic verification documentation with those supporting
 documents (i.e. the initial approval documentation, or change control
 
 documentation) as applicable. 
 
 6.4 Design and Create Data Sheets and Triggers 
 
 6.4.1 There are three types of data sheets. The table below defines the behavior of
 
 each type: 
 
 Included in Included in Sign Must be linked to a
 Data sheet Type Scoring method 
 Quality Dashboard Off Dashboard production run 
 Quality Check Pass / Fail Yes Yes Yes 
 Production Check Pass / Fail No No No 
 Audit Numeric Score No No No 
 
 6.4.2 Quality Check data sheets are associated with a production run and therefor a
 production batch. Quality Check data sheets include activities like a run startup
 
 check, a run process check, etc. 
 
 
 

[SOP 

 Standard Operating Procedure SOP No | Rev 
 C-108 0 Page 5 of 14 
 Redzone Administration Activities 
 
 6.4.3 Production Checks are not associated with a run. These checks are independent
 of a specific production run or batch number and include activities like a scale
 
 daily check, equipment calibration, or an environmental monitoring check.
 
 6.4.4 Audit data sheets are also independent of any specific production run or batch
 
 number. The key difference for Audit data sheets compared to the other two
 
 data sheet types, is that Audit data sheets provide a score when completed.
 
 6.4.5 Create the appropriate type of data sheet to fit the needed function. Use control
 
 limits on fields when applicable. Use triggers to automate compliance with
 applicable procedures. Attachment 1 defines fields available for use within data
 
 sheets. Attachment 2 defines triggers available for use with data sheets. Review
 data sheets during the design phase to ensure compliance with applicable
 
 procedures. Procedures may need to include adoption of RZ data sheets into the
 
 process. 
 
 6.5 PQ Conditions 
 
 6.5.1 Installation Qualification (IQ) and Operational Qualification (OQ) of RZ
 validate the basic functionality of RZ and do not need repeating. Further
 
 Performance Qualification (PQ) documentation of the application of RZ to
 specific cGMP functions is dependent upon the complexity and purpose of the
 
 application. The following defines when a PQ report is required in a report as
 
 defined later in this SOP and when it is not. 
 
 Note: PQ activities (i.e. verification that the RZ works as intended) is always required.
 
 Documentation of that verification is defined here. 
 
 6.5.1.1 A PQ Report is required only for automating a cGMP process by RZ.
 
 Automation includes: 
 
 ® When RZ performs cGMP calculations 
 
 
 

[SOP 

 Standard Operating Procedure SOP No | Rev 
 C-108 0 Page 6 of 14 
 Redzone Administration Activities 
 
 When RZ determines the outcome of a cGMP test (ie.
 checking results to Pass, warn, or Fail) 
 
 When RZ schedules GMP work or performs a cGMP 
 
 function and Jon trusts that schedule or work without any
 other safeguard to make sure that work or function happens
 
 (i.e. the automatic trigger of a data sheet based on specific
 events) 
 
 6.5.1.2 Ion Labs may choose to write a PQ report, but a PQ report is not
 required for the following applications of RZ: 
 
 RZ data sheets used for non-GMP purposes 
 
 RZ data sheets that only collect data (i.e. no automation)
 
 RZ data sheets that include automation, but that automation
 
 is not a cGMP requirements. For example, RZ triggers may
 provide alerts or messages that are for convenience, but are
 
 not a cGMP function. 
 
 Minor modification of a previously verified RZ application
 
 (see further discussion on this topic later in this procedure).
 
 6.6 RZ Process — PQ Steps 
 
 6.6.1. When creating or modifying RZ Compliance Components (i.e. data sheets,
 
 triggers, and/or reactions), always test and verify that they function as intended
 before deployment for cGMP activity use (i.e. complete PQ steps defined here).
 
 Note: This activity may require documentation in a PQ report as defined later in this
 procedure. Consider and address the following during PQ activities as
 
 applicable. 
 
 
 

[SOP 

 Standard Operating Procedure SOP No | Rev 
 C-108 0 Page 7 of 14 
 Redzone Administration Activities 
 
 6.6.1.1 When possible, test new components using “RZ Test” components (1.e.
 areas, locations, products) rather than real components.
 
 6.6.1.2 When using real components to test new components, add comments
 as applicable, indicating that the activity is for test purposes and not
 
 associated with real production activities. 
 
 6.6.1.3 For complicated trigger/reaction scenarios, be sure to test all applicable
 paths. For example, test passing, warning, and failing results if the
 
 triggers involved should behave differently under those conditions.
 
 6.6.1.4 Test data sheets that connect to product characteristics to ensure that
 
 they connect as expected. 
 
 6.6.1.5 Test data sheets that contain calculations to ensure that formulas work
 
 as expected. 
 
 6.6.1.6 Consider the steps necessary to deploy the process in RZ.
 
 6.6.1.7 Ensure that the RZ components align with the requirements of
 applicable procedures and regulations associated with the intended
 
 purpose. 
 
 6.6.1.8 Update procedure as necessary to provide operators with necessary
 instructions to use the RZ components. 
 
 6.7 Redzone PQ Report Requirements 
 
 6.7.1 Upon completion of PQ activities for a cGMP RZ process as defined in this
 
 procedure, complete a PQ report. The PQ report must include, at a minimum,
 the following features: 
 
 6.7.1.1 Assign a report number and comply with report requirements as
 defined in SOP C-105 Protocol and Report Documentation 
 
 Requirements. 
 
 
 

[SOP 

 Standard Operating Procedure SOP No | Rev 
 C-108 0 Page 8 of 14 
 Redzone Administration Activities 
 
 6.7.1.2 Reference this procedure as the source of PQ requirements for the
 report. 
 
 6.7.1.3 List all RZ components subject to the PQ. Cover any number of
 components in the same report as needed. It is best practice to group
 
 components into the same report by function, process, or purpose.
 
 6.7.1.4 List procedures that the RZ components support. Verify that the
 functionality of the components align with procedure requirements.
 
 Procedures may need revision to accommodate RZ as part of the
 
 process. 
 
 6.7.1.5 Describe the RZ components and intended use. Flow charts are not
 necessary for simple PQs, but are best practice for complicated
 
 processes. 
 
 6.7.1.6 Describe the PQ steps used. It is not necessary to list every step in
 detail. Do include: 
 
 8 Who was involved in the PQ steps described and the dates
 the activities occurred. 
 
 ® Provide enough detail to allow finding evidence of the steps
 taken within RZ as applicable. 
 
 6.7.1.7 It is not necessary to record screenshots to document PQ activities.
 
 6.7.1.8 Describe the deployment plan as applicable. 
 
 6.7.1.9 Define at least two signatures on the report that indicate Done By and
 Verified By with regard to the PQ activities. At least one signature on
 
 the report must be a quality signature. 
 
 6.8 Modification to Previously Verified RZ Processes 
 
 
 

[SOP 

 Standard Operating Procedure SOP No | Rev 
 C-108 0 Page 9 of 14 
 Redzone Administration Activities 
 
 6.8.1 Major modifications to a previously verified application of RZ to a cGMP
 system require re-execution of the PQ process as described here. Minor
 
 modifications do not require re-execution. The discussion of PQ Conditions are
 a good definition of the intent of PQ as it applies to RZ. If the changes made
 
 fall into examples of a system that would require PQ, then re-execution is
 
 required. If not, the re-execution is also not required. The list that follows are
 examples of changes that would not necessarily require documented re-
 
 qualification: 
 
 6.8.1.1 Changes to test on a data sheet 
 
 6.8.1.2 Adjustments to triggers or data sheets to include new products or
 locations 
 
 6.9 RZ Test Components 
 
 6.9.1 RZtest...”” components exist in the live RZ system only for training and testing
 purposes. Some of these components require a username and password to create
 the component (i.e. Area, Location, or User Components). IT is responsible for
 
 managing all users and the RZtestUser account is disabled during normal
 operations. The username and password for Areas and Locations is available to
 allow a system login as an Area or Location. TRZ does not allow this login any
 administration privileges. Ion Labs does not use this feature. Do not distribute
 passwords for Locations or Areas. Do not distribute passwords for Locations or
 
 Areas. 
 
 6.10 Understanding Revision History in the RZ Admin Application 
 
 6.10.1 The revision history of components (i.e. people, places, products, shifts, data
 sheets, and triggers) in the RZ Admin application have a similar method of
 displaying revision history. The application stores revisions to these
 
 components under a revision section on the same screen where editing of these
 components occurs. The system groups changes based on the date and time the
 user saves the changes. A single header includes the revision number, the user
 that made the change and the date and time for the “save” event. Under that
 header are all the changes listed individually with a colored dot next to the
 
 change. The color of the dot has the following meanings: 
 
 6.10.1.1 Green dot = fields / values added 
 
 
 

[SOP 

 Standard Operating Procedure SOP No Rev 
 Page 10 of 14 
 C-108 
 Redzone Administration Activities 
 6.10.1.2 Red dot = fields / values removed 
 
 6.10.1.3 Orange dot = fields / values changed 
 
 6.10.2 Use revision history documented in RZ in conjunction with other system
 documentation (e.g. the initial approval documentation, or change control
 documentation) to investigate and confirm deviations, errors, and routine
 
 changes. 
 
 7.0 Revision History 

| Rev | Date | Description of Changes | CCR # | By |
|-----|----------|------------------------|-------|----|
| 0 | 03/14/22 | New procedure. N/A K. Burris | - | - |

 8.0 Attachments 
 
 8.1 Attachment | — Redzone Data Fields 
 8.2 Attachment 2 — Redzone Triggers and Reactions 
 
 
 

[SOP 

 Standard Operating Procedure SOP No | Rev 
 C-108 0 Page 11 of 14 
 Redzone Administration Activities 
 
 Attachment 1 — Redzone Data Fields 
 
 Table 1: Field Types 
 Field Type Description 
 
 Keyboard The user may enter text from the device keyboard. 
 
 The user may enter text from the device keyboard; however, the format of the
 text entered must comply with a “mask” custom defined for the field. For
 Formatted Text example a mask of “(###) ###-####” would force a typical phone number
 format. A mask of “JON-####” would only allow a four-digit asset number
 with “ION-“preceding the asset number. 
 Whole Number The user may enter a whole number. 
 
 The user may enter a decimal number. This field allows the control of the
 Decimal Number number of digits store through the “Decimal Precision” option for the data
 field defined during datasheet design. 
 
 Date (Day & Time) The user may enter a date and time 
 
 Date (Day & Year) The user may enter a date without a time. 
 
 Photo Allows the insertion of a photo taken from the device (iPad) in real time
 Allows the insertion of a photo taken from the device (iPad) in real time or a
 Photo or Camera Reel 
 photo chosen from a previously taken photo 
 Allows taking a scan of a barcode or QR code and will input the result into the
 Barcode field, 
 Maven ast Allow selection from a list of options defined for a product characteristic.
 
 Option List Allow selection from a previously defined option list. Option lists are defined
 in the Redzone administration app. 
 The user may enter a series of numbers. The field allows control of the count
 of numbers the user enters through a “Sample Size” setting for the field. An
 Numeric Sample Set 
 “agoregation” setting for the field also defines an aggregation method as one
 of the following (Mean, Median, Mode, Max, Min, Sum, or Range).
 The user may define an expression. The expression may consist of other fields
 Expression on the datasheet and the functions defined in Error! Reference source not
 found.. 
 This field is used in conjunction with a Numeric Sample Set field. The
 Secondary Test secondary test applied a different aggregation setting to the same data
 collected in the Numeric Sample Set field. 
 
 
 

[SOP 

 Standard Operating Procedure SOP No | Rev 
 C-108 0 Page 12 of 14 
 Redzone Administration Activities 
 
 Attachment 1 — Redzone Data Fields 
 
 Error! Reference source not found. below defines functions available for use in a RZ Expression field
 type 
 
 Table 2: Expression Functions 
 Function Description 
 
 Add (+) Addition 
 
 Subtract (-) Subtraction 
 
 Multiply (x) Multiplication 
 
 Divide (+) Division 
 
 ; Opening parentheses “(‘‘, and closing parentheses “)” may be used to control
 Parenthesis ; aan 
 the order of operation within the expression. 
 Maximum The maximum of values contained within the function 
 
 Minimum The minimum of values contained within the function 
 
 Mean The mean of values contained within the function 
 
 Mode The mode of values contained within the function 
 
 Range The range of values contained within the function 
 
 Sum The sum of values contained within the function 
 
 Product The product of values contained within the function 
 
 Count The count of values contained within the function 
 
 Reference Reference other data fields on the same data sheet. 
 
 
 

[SOP 

 Standard Operating Procedure SOP No | Rev 
 C-108 g | Page 13 of 14 
 Redzone Administration Activities 
 
 Attachment 1 — Redzone Data Fields 
 
 Error! Reference source not found. below lists options available for use with RZ fields. These
 options may be: 
 ® Omitted 
 & Applied specifically to the field in the datasheet, or 
 
 ® Applied as a product characteristic specific to the product associated with the instance of the
 datasheet 
 
 Table 3: Data Field Options 
 
 Option Description 
 This option defines the number of places after the decimal point that the
 Decimal precision system will use to evaluate this field against limits defined by the next rows of
 this table. 
 The lowest value considered as a reasonable entry. Values lower than this will
 Lower Reasonable 
 prompt the user that this may not be a reasonable. This limit may prevent
 limit 
 entry errors. 
 The lowest value allowed that still meets the specification. Values lower than
 Lower spec limit 
 this will produce a FAIL status. 
 The lowest value allowed that is in control. Values lower than this will
 Lower control limit produce a WARN status. The values may be set or based on SPC calculation.
 This represents the specification value. This may be different from the target
 Spec Standard value. For example, a specification may be 100% while a target may be 105%
 for a product formulated with a 5% overage. 
 This represents the expected target value. See also the description of Spec
 Target value 
 Standard. 
 The highest value allowed that is in control. Values higher than this will
 Upper control limit 
 produce a WARN status. The values may be set or based on SPC calculation.
 The highest value allowed that still meets the specification. Values higher
 Upper spec limit 
 than this will produce a FAIL status. 
 The highest value considered as a reasonable entry. Values higher than this
 Upper reasonable limit will prompt the user that this may not be a reasonable. This limit may prevent
 entry errors. 
 
 
 

[SOP 

 Standard Operating Procedure SOP No | Rev 
 C-108 0 Page 14 of 14 
 Redzone Administration Activities 
 
 Attachment 2 — Redzone Triggers and Reactions 
 Table 4: Triggers 
 
 Trigger Type Description 
 Shift Started The trigger will fire upon the start of a shift. 
 Shift Ending The trigger will fire once the shift is ended. 
 
 Shifeuntine rere an interval where the trigger will fire based on uptime during the
 
 Shift downtime Define an interval where the trigger will fire based on total downtime during
 the shift. 
 Shift continuous Define an interval where the trigger will fire based on a period of continuous
 downtime downtime during the shift. 
 ; ; Define an interval where the trigger will fire based on elapsed time during
 piso er sea ui the shift (regardless of uptime or downtime). 
 ; , Define an interval where the trigger will fire based on the total number of
 Shift units produced ; .; 
 units produced during the shift. 
 Run started The trigger will fire upon the start of a run 
 
 Run ending The trigger will fire once the run is ended. 
 Run uptime Define an interval where the trigger will fire based on uptime during the run.
 
 Define an interval where the trigger will fire based on total downtime during
 Run downtime 
 the run. 
 Run continuous Define an interval where the trigger will fire based on a period of continuous
 downtime downtime during the run. 
 Define an interval where the trigger will fire based on elapsed time during
 Run elapsed time 
 the run (regardless of uptime or downtime). 
 Define an interval where the trigger will fire based on the total number of
 Run units produced 
 units produced during the run. 
 Define a specific percentage of completion where the trigger will fire based
 Run percentage complete 
 on the scheduled quantity of the run. 
 Define an interval where the trigger will fire if the run is not signed off or
 Run sign off incomplete 
 locked 
 Datasheet completed Specify a datasheet and result that will trigger this data sheet to be created.
 Datemtcemplcted Trigger will fire based on the defined result of a specific data item on a
 datasheet. 
 Can configure trigger to fire on a specific month, day of the month or week,
 Calendar 
 and time of day. 
 : Specify a start date/time, and define an interval for the trigger to fire
 Recurring 
 regularly. 
 Trigger will fire upon creation of a problem — based on Problem Type,
 Problem created 
 Group, Category, or Asset. 
 Trigger will fire based on the defined result of a cycle — can be based on
 Cycle update 
 specific assets or products.