G-102
Equipment Profiles
Original Document
Scanned document (image-only PDF)
Extracted Text
Searchable text extracted from PDF
1.0 Purpose This procedure defines the process of creating and maintaining records on each piece of process equipment or testing equipment used at Ion Labs, Inc. 2.0 Scope This procedure applies to all process equipment and testing equipment in use at Ion Labs, Inc. 3.0 Responsibility 3.1 It is the responsibility of Maintenance and/or Engineering Management or designee to complete equipment profiles for equipment within their department and to submit it to DC. 3.2 It is the responsibility of DC to assign asset numbers and to maintain the current master equipment list and all equipment profiles. 3.3 It is the responsibility of Maintenance and/or R&D to initiate form G-103-F1 Installation and Operational Qualification (OQ) Checklist (if applicable) after the equipment profile has been approved. 4.0 Definitions 4.1 PM — Preventative Maintenance 4.2 DC — Document Control 4.3 QC — Quality Control 5.0 References “N [SOP Standard Operating Procedure SOP No Rev ee a Equipment Profiles G-102 4 age 2 of 5 5.1 G-103, SOP, Qualification of Equipment 5.2. G-201, SOP, Calibration Program 5.3. G-102-F1, Form, Equipment Profile 5.4 G-103-F1, Form, Installation and Operational Qualification (IOQ) Checklist 5D C-502, SOP, Document Storage, Retention, and Destruction 6.0 Procedure 6.1 Equipment profiles will be completed for each piece of equipment on the master equipment list. 6.1.1 Form G-102-F1 Equipment Profile lists the primary identifying information about the equipment: 6.1.1.1 Ion Asset Number — each piece of equipment will be assigned a unique sequential asset number consisting of the letters ION, followed by a four digit sequential number (e.g. ION-0001) 6.1.1.2 Equipment Description 6.1.1.3. Manufacturer 6.1.1.4 Model Number (if available) 6.1.1.5 Serial Number (if available) 6.1.1.6 Purchase Order Number 6.1.1.7 Date of Receipt of Equipment 6.1.1.8 Equipment Location Note: Legacy equipment may not have all of the purchasing information. Document “Legacy Equipment” if not available. [SOP Standard Operating Procedure SOP No Rev G-102 Page 3 of 5 Equipment Profiles 6.1.1.9 Calibration Requirements and Recommended Frequency 6.1.1.10 Maintenance Requirements and Recommended Frequency 6.1.1.11 Name and Date of Employee Completing the Profile OZ Quality will review for completion and approve the completed profile. 6.1.3 A copy of any literature or software, including manuals or bulletins that accompany the equipment, will be filed with the equipment profile if possible. 6.1.4 Original machine manuals will be filed in maintenance for ease of use. 6.1.5 Once approved, all information will be entered by DC into the Master Equipment List. 6.2 Upon approval of the equipment profile: 6.2.1 DC will submit a copy of the profile to QC Laboratory/Analytical Development Management for inclusion in the Calibration Program (refer to SOP G-201 Calibration Program). 6.2.2 SD will submit a copy of the profile to the initiator to thatForm G-103-F1 Installation and Operational Qualification (IOQ) Checklist can be completed. (refer to SOP G-103 Qualification of Equipment. 6.2.3 Once G-103-F1 Installation and Operational Qualification (IOQ) Checklist has been finalized, it will be scanned and filed with the associated equipment profile. 6.3 When a piece of equipment that has an asset number assigned to it is removed from service, DC must be alerted so that the item may be marked as “Out of Service” on the master equipment list. [SOP Standard Operating Procedure SOP No Rev G-102 Page 4 of 5 Equipment Profiles 6.4 Equipment Types that require an Asset Number 6.4.1 The following types of equipment require an asset number before they can be used. There may be other equipment types not listed below that must also comply with this procedure. 6.4.1.1 Manufacturing Equipment 6.4.1.2 Packaging Equipment 6.4.1.3 Mobile Fans 6.4.1.4 Hygrometers and Thermometers 6.4.1.5 Scales 6.4.1.6 Test and Calibration Pieces 6.4.1.7 Blender Magnets 6.4.1.8 QC Laboratory Equipment 6.4.1.9 Shop Vacuums 6.4.1.10 Dehumidifiers 6.4.1.11 Humidifiers 6.4.1.12 Sensors 6.5 Documentation Requirements 6.5.1 Documents will be maintained following SOP C-502 Document Storage, Retention, and Destruction. [SOP Standard Operating Procedure SOP No | Rev oe Equi. pment Profiles o“i e ’ ag:es 0 7.0 Revision History | Rev | Date | Description of Changes | CCR # | By | |-----|----------|------------------------|-------|----| | 0 | 04/27/10 | New - - 03/25/13 Changed SOP format and number. Updated SOP. 13-197 I. Iichev Obsoleted G-102-F2, C-102-F3. Included G-101 in G-102. 2 eos Clarified SOP to accurately reflect the current process. ieee D2 EOPp | - | - | | 3 | 02/05/19 | Scheduled review: updated calibration program responsibility. Added additional reference. | 19-0124 | Runs | | 4 | 04/06/22 | Scheduled review: Updated responsibilities. Changed logo. Added CC- list of equipment that requires asset numbers. | 22-0161 | K. Burris | [SOP IANLABS Equipment Profile Form * * G-102-F1 CCR No. CC-22-0161 Rev1810n 4 POeSeA / Oo / oO / Oo Comments Completed By Datee ° Approved By (Quality) Date° °